Commissioning (storage facility)
glossary
| Expression | definition |
|---|---|
| Commissioning (storage facility) | Commissioning (warehouse facility) Process of the initial activation and testing of a new logistics facility. Explanation: Commissioning a storage system is the process in which a newly installed system, such as an automated small parts warehouse, a high-bay warehouse, or a conveyor system, is switched on, configured, and tested for the first time. It marks the transition between assembly and productive operation. Steps: Inspection of the mechanical and electrical installation, switching on and functional tests of individual components, calibration of sensors and drives, testing of safety devices, integration of the control system and the material flow computer, integration tests with the warehouse management system, performance and endurance tests and acceptance. Participants: Plant supplier, control and IT specialists, operator, safety experts and, if necessary, external testing bodies. Example: When commissioning a new shuttle warehouse, the shuttles are first tested individually, then entire levels, and finally the interaction with the picking stations. Acceptance only follows after successful performance testing. Things to consider: Allow sufficient time, as delays are common. The acceptance criteria should be clearly defined in the contract. Conformity with machine safety regulations must be demonstrated and documented before employees operate the equipment.
Access - 116 |

















